Method of Calculation
PFD Allowance - Personal, Fatigue and Delay Allowance formula ( the standard time )
The Standard Time = ( Observed Time ) ( Rating Factor ) + ( Observed Time ) ( Rating Factor)
( PFD Allowance )
*boleh dimasukkan dalam proses Flow
Process Control Plan ( PCP )
Pelan kawalan proses memberikan "keterangan ringkasan" didokumentasikan
kaedah yang digunakan untuk meminimumkan proses
dan produk variasi. Ini menyediakan pendekatan berstruktur untuk
design, pemilihan dan pelaksanaan nilai tambah
kaedah kawalan. Hal ini tidak dimaksudkan untuk menggantikan terperinci
maklumat yang terkandung dalam arahan kerja pembekal
PFD Allowance - Personal, Fatigue and Delay Allowance formula ( the standard time )
The Standard Time = ( Observed Time ) ( Rating Factor ) + ( Observed Time ) ( Rating Factor)
( PFD Allowance )
*boleh dimasukkan dalam proses Flow
Process Control Plan ( PCP )
Pelan kawalan proses memberikan "keterangan ringkasan" didokumentasikan
kaedah yang digunakan untuk meminimumkan proses
dan produk variasi. Ini menyediakan pendekatan berstruktur untuk
design, pemilihan dan pelaksanaan nilai tambah
kaedah kawalan. Hal ini tidak dimaksudkan untuk menggantikan terperinci
maklumat yang terkandung dalam arahan kerja pembekal
Planning For Mass Production
- Nak keluarkan beribu2 barang yang terdiri daripada beberapa ratus orang pekerja.
Continuous Production
- dibuat sekiranya permintaan keatas sesuatu produk tinggi.
( dibuat secara shift..cth 8pg-8mlm )
Single Item Production
- orang yang betul2 expert dlm keja 2..kalu xder dia keja x jalan.
Batch Production
- not a single people to setup the product.
Benefit
* Promote understanding of a process
* Identities problem areas and opportunities
* Provides a way
Symbol use in Flowchart (standard Flow )
Sunday, February 20, 2011
WI
WORK INSTRUCTION (WI)
Written instructions or procedures can prevent many problems:
“I thought you said……..”
“I did not know where that was kept”
“No one told me that I had to do it that way”
Sound familiar??
The Benefits:
- Effective communication- if the boss is away, staff simply refer to the WI or SOP for instruction
- Provides clear and easy to understand instructions.
- Useful when training new or temporary staff
- Reduces the possibility of mistakes being made
- Information in writing is less likely to be forgotten or misunderstood.
Procedures or Work Instructions
What is a Procedure?
A procedure is a written instruction that describes what has to be done, by whom, when, how and where.
Why use procedures?
-what people think is being done
-what actually being done, most of the time
-shot cut on
-what should be done
Step to follow
-Write down in simple steps
-review the steps
-Number each steps
Work Instruction Breakdown
*page number
*date
*author
*procedure description
*who is responsible for the procedure
*where
*when
*reference document
*actual step (langkah2 yg perlu diambil)
Thursday, February 17, 2011
TUESDAY, JANUARY 25, 2011
QUOTATION ( sebut harga )
* Material - specification / certification
* Quantity
* Price
* Brand
•A quotation is given to customer prior to the order
–The quotation is given based on the costing of the product sold.
•Material cost
•Labour ( pekerja/kos masa )
•Overhead ( elektrik,mesin dll )
•Transportation – Delivery terms
•Sales Tax ( tax yg dikenakan oleh kerajaan )
•Mark-up ( % keuntungan )
DELIVERY TERMS
QUESTION
What is Quotation?
-satu dokumen yang menentukan jenama, kuantiti, jumlah barang, dan harga.
Why is quotation necessary?
-untukk menentukan kos / harga product tersebut.
- menentukan yang terbaik dari segi harha , kuantiti, masa dll.
Can a quotation be revised?
- yes, may b nak tukar jenama brg @ cara pengangkutan.
What is the importance of validity in the quotation?
- masa yg d berikan tepat
- tempoh masa
Why we have delivery terms in the quotation?
- x tau sapa yg b'tanggungjawab ke atas penghantaran.
What is the difference between DDP n DDU
- DPP = delivery duty paid
- DDU = delivery duty Unpaid
Can we send quotation by e-mail
-yes
Thursday, February 10, 2011
CONTOH BOM
Item no: BRDWHT0250
Description: Loaf White Bread 250g
Version: A Revision: 1
Effective date: 25/12/2006
Tuesday, February 8, 2011
Bill Of Material
BILL OFF MATERIAL
A Bill of Materials (BOM) describes a product in terms of its assemblies, sub-assemblies, and basic parts. Basically consisting of a list of parts, a BOM is an essential part of the design and manufacture of any product. It is also known as recipe, formula or ingredient list.
CoNtoH
What information must exist in a BOM?
Item no
Description
Quantity
UOM
Supplier
Brand
Project Cost Planning
PenTingnya kAWalaN Kos
"ini harta ana yang punya"
- kos merupakan salah satu tujuan projek
- Unless cost is controlled, project objectives can be jeopardized
- Kos, Masa dan kualiti adalah saling berkaitan.
- Sebahagian besar projek mempunyai lebihan kos
- who control cost
- when to control cost
- where to control cost
- How to control cost?
"ini harta ana yang punya"
Saturday, January 29, 2011
prOjecT PlaNninG
WHAT IS PROJECT?????
- A network of inter-related activities that are planned and then executed in a certain sequence to create a unique product or service within a specific time frame.
ELEMENT IN A PROJECT :
-Resources
-money
-scopes
-times
WHAT IS PROJECT MANAGEMENT??????
- Project management is the application of knowledge, skills, tools and techniques to project activities to meet project requirements.
- Formalized and structured method of managing change
- It focuses on achieving specifically defined outputs that are to be achieved by a certain time, to a defined quality and with a given level of resources
THREE ELEMENT IN A PROJECT MANAGEMENT :
-cost
-duration
-quality
BiLL Of materiaL (BoM)
A bill of materials is a list that specifies the parts used to build a product. When a company produces a product, it must keep track of the materials and components used in its creation.
-This bill of materials must be included with the product before shipping it to a merchandiser, client, or buyer. Generally, it is included inside the box in which the product is shipped.
In a way, a bill of materials is similar to a recipe.
-Every ingredient used is listed in the bill of materials. Strict record keeping is the key rule to creating abill of materials, because no item can be skipped. This is largely because the bill of materials can be used later to narrow down issues for repairs of a product if necessary. In addition, a bill of materials is essential when ordering replacement part
Thursday, January 20, 2011
December 29, 2010
Class Of ip address...
* A = 00000001 - 01111111 1 - 127
kelas D = reserve
kelas E = experiment
* B = 10000000 - 10000000 128 - 191
* C = 11000000 - 11000000 192 - 223
* D = 11100000 - 11100000 224 - 239
* E = 11110000 - 11110000 240 - 247
kelas E = experiment
JENIS-JENIS RFID
* RFID Tag Pasif
Yang tidak mempunyai daya sumber dan medan lektromagnet
luaran untuk memulakan penghantaran isyarat.
* RFID Tag Aktif
Yang mengandungi bateri dan boleh menghantar sekali isyarat
sumber luaran (interagator) yang telah berjaya dikenalpasti.
* Bateri Pasif
Dibantu (BAP) RFID Tag, yang memerlukan sumber luaran untuk
bangun tetapi mempunyai kemampuan yang lebih tinggi ke depan
yang signifikan untuk memberikan rentangan yang lebih
APA ITU RFID
DEFINASI RFID
RFID (pengenalan frekuensi radio) adalah teknologi yang menggabungkan penggunaan kopling elektromagnet atau elektrostatik dalam frekuensi radio (RF) sebahagian daripada spektrum elektromagnet untuk secara unik mengenalpasti objek, binatang, atau orang. RFID akan datang ke dalam peningkatan penggunaan dalam industri sebagai alternatif untuk kod bar.
RFID (pengenalan frekuensi radio) adalah teknologi yang menggabungkan penggunaan kopling elektromagnet atau elektrostatik dalam frekuensi radio (RF) sebahagian daripada spektrum elektromagnet untuk secara unik mengenalpasti objek, binatang, atau orang. RFID akan datang ke dalam peningkatan penggunaan dalam industri sebagai alternatif untuk kod bar.
Tuesday, January 4, 2011
project manager
Project Maneger
Seorang pengurus projek adalah seorang yang profesional dlm bidang pengurusan projek. Pengurus projek mempunyai tanggung jawab dlm pelaksanaan, perancangan, dan penutupan setiap projek, kebiasanya ia berkaitan dengan industri pembinaan,senibina, rangkaian komputer, telekomunikasi atau pembangunan perisian.